All Products
Keywords [ building site lift ] match 265 products.
Safety Control 450 Meter Rack & Pinion Construction Passenger Hoist
Name: | Construction Passenger Hoist |
---|---|
Application: | Building Site, Bridges, Chimney, Plants, Etc. |
Design: | According To European Regulation EN 12159:2012, EN 60204-1:2006/A1:2009. |
Proof TUV and Anti-fall Safety Device Construction Hoist for Your Construction Solutions
Lifting Speed: | 0-63 M/min |
---|---|
Drive: | Frequency Conversion Control |
Motor Control: | FC |
Frequency Control High Safety Bridges Rack And Pinion Hoist
Name: | Rack And Pinion Hoist |
---|---|
Application: | Construction Sites, Plants, Bridges |
Design: | According To European Regulation |
Helical Gearaboxes Builders 450M Construction Material Hoist
Name: | Material Hoist Lift |
---|---|
Max Height: | 450 M |
Design: | Modular |
Helical Gearbox Builders Construction Passenger And Material Hoist 450M
Name: | Material Hoist Lift |
---|---|
Max Height: | 450 M |
Design: | Modular |
Modular Design Double Cage 3000kg Construction Hoist Elevator
Name: | Construction Hoist Elevator |
---|---|
Application: | Construction Site, Factory |
Design: | Modular Design |
Intelligent Elevator Control 60M / Min Man And Material Hoist
Name: | Man And Material Hoist |
---|---|
Application: | Material And Passenger Transportation At Construction Site |
Material: | Q345B Steel |
3.2 X 1.5 X 2.5 M Cabin Size Rack And Pinion Hoist with 650x650x1508mm Mast Section and Q355B Steel Materials
Mast Section Size: | 650x650x1508mm |
---|---|
Lifting Speed: | 0-63 M/min |
Spare Parts: | Universal And Interchangeable |
Sand Blasting Construction Hoist Elevator Payload Capacity 2000Kg FC Control
Item: | Construction Hoist Elevator Rack And Pinion SC200/200(BZ) KP-B07, B08 |
---|---|
Work Mode: | Mast Climbing |
Purpose: | Vertical Transportation Of Man And Materials In Construction Site Or Building |
Construction Elevator Payload Capacity 2000Kg With Reliability And Durability
Item: | Construction Hoist Elevator Rack And Pinion SC200/200(BZ) KP-B07, B08 |
---|---|
Work Mode: | Mast Climbing |
Purpose: | Vertical Transportation Of Man And Materials In Construction Site Or Building |